Buford Shop Upgrades: A New Ceiling and LED Lighting
January 20, 2021 | Shara Ryan

During a planned closure, Team Ryan Automotive added a sheetrock ceiling and new LED lighting to the nearly 5,000-square-foot work area at its Buford shop.
Originally published on January 20, 2021, this photo report shows the renovation in progress and the finished space.
Why we made the changes
The project focused on working conditions for our technicians. Our original update described brighter lighting that made it easier to see their work, along with better climate control after the ceiling was installed.
Installing the ceiling while the shop was closed
Installing sheetrock throughout the work area was too disruptive to do while the shop was operating. We scheduled the work during a closure, when employees and customers were spending time with their families.
The original photographs below show different stages of the installation.
The finished shop
The photograph below shows the completed ceiling and LED lighting above the service bays.
Building on earlier upgrades
By the time of this update, the Buford building had already received finished floors, vehicle lifts and remote-controlled bay doors. The ceiling and lighting were another step in improving the space.
For photographs of the building's earlier transformation, see our first year in Buford.
Our original post connected these improvements with caring for the people who work at the shop and the customers they serve. Read more about our mission, vision and core values in The Team Ryan Way.